Grand Central Wireless

87 E 42nd St

Transportation and Warehousing

Grand Central Station

A&R Technology Solutions completed a critical ductwork project at Grand Central Train Station, where we played a pivotal role in enhancing ventilation and airflow within the electrical room responsible for controlling the trains' electric systems. By strategically redirecting air from one location to another, we optimized ventilation to ensure proper functioning and prevent overheating. Our team implemented exhaust systems to efficiently remove hot air from the electrical room, maintaining optimal operating conditions. This project highlights our commitment to innovative solutions and expertise in addressing complex HVAC challenges, further solidifying A&R Technology Solutions' reputation as a trusted partner in ensuring safety and efficiency in critical infrastructure.

Project Included

Renovation
212 LINEAR FEET
2178 Pounds
5 INSTALLATION DAYS

Project Images

If you are looking for duct work design, fabrication or
installation for commercial applications, schedule a meeting.