Mount Sinai
Duct work Project Details
A&R Air Technology Solutions Fabricated Duct work for Select Mount Sinai Brooklyn Medical Center Suites
The A&R team field-measured the project to ensure that contract drawings reflected the existing conditions. Next, the team created in-house shop drawings to serve as blueprints, then oversaw fabrication and installation.
Project Included
Renovation
500 LINEAR FT
3,000
Pounds
9 INSTALLATION DAYS