SL Green
A&R Air Technology Solutions completed a critical build-out ductwork project within the mechanical room for SL Green, situated on the 2nd floor, Suite #203 of 110 Greene St. Our specialized team meticulously designed and installed a customized ductwork system to ensure optimal airflow and ventilation within this essential space. By prioritizing efficiency and functionality, we contributed to the smooth operation of mechanical systems, enhancing the overall functionality and comfort of the building. A&R Air Technology Solutions remains committed to delivering superior results for clients like SL Green, supporting their operational needs and property maintenance.
Project Included
Renovation
193 LINEAR FEET
2456
Pounds
4 INSTALLATION DAYS