SL Green
A&R Air Technology Solutions completed a ductwork project on the roof of 220 E 42nd St for SL Green. Our skilled team modified the ductwork system to optimize airflow and ventilation efficiency on the building's rooftop. By adhering to stringent industry standards and leveraging our expertise, we ensured enhanced performance and durability of the ductwork, crucial for maintaining optimal building operations. A&R Air Technology Solutions remains dedicated to delivering innovative solutions that meet the unique requirements of our esteemed clients, contributing to the overall functionality and longevity of their properties.
Project Included
Renovation
16 LINEAR FEET
104
Pounds
1 INSTALLATION DAYS