SL Green
A&R Technology Solutions completed a ductwork installation at 485 Lexington Avenue, 30th floor, in Manhattan, NY. The project involved designing and installing an efficient, high-performance HVAC duct system tailored to the needs of this modern commercial space. Our team worked diligently to ensure minimal disruption to building operations while delivering top-quality workmanship that enhances air circulation and energy efficiency. The job was completed, ensuring the 30th-floor occupants enjoy a comfortable and well-ventilated workspace.
Project Included
Renovation
2285 LINEAR FEET
15008
Pounds
43 INSTALLATION DAYS