Studebaker Building

615 W 131st St

Schools and Universities

Columbia University

A&R Technology Solutions completed a complex ductwork project at the Columbia University Studebaker Building. Our team installed high-quality stainless steel ductwork along the side of the building, extending all the way up to the roof. In addition to optimizing airflow throughout the structure, we addressed specific needs by designing and installing systems to exhaust fumes from the carpentry shop. This comprehensive approach ensures both efficient ventilation and a safe working environment for all occupants. A&R Technology Solutions takes pride in delivering tailored solutions that meet the unique requirements of each project, contributing to the overall success of facilities like the Columbia University Studebaker Building.

Project Included

Renovation
598 LINEAR FEET
3634 Pounds
9 INSTALLATION DAYS

If you are looking for duct work design, fabrication or