Blue Apron
Ductwork Project Details
A&R Air Technology Solutions designed, manufactured and installed ductwork for the HVAC system for Blue Apron’s headquarters.
Our team field-measured the project to ensure contract drawings reflected the existing conditions. Next, we created in-house shop drawings to serve as blueprints and oversaw fabrication and installation.
Project Included
Renovation
600+/- LINEAR FT
8,100+/-
POUNDS
4 INSTALLATION DAYS