Bank of America
Ductwork Project Details
A&R Air Technology Solutions designed and installed ductwork for select Bank of America financial centers, spanning 15,000 square feet.
Our team field-measured the project to ensure that the contract drawing reflected the existing conditions. Next, we created in-house shop drawings to serve as blueprints and oversaw fabrication and installation.
Project Included
New Installation
5,000 +/- LINEAR FT
8,100+/-
POUNDS
12 INSTALLATION DAYS